榆林地区井工煤矿采煤方法与开采装备发展及展望

Development and prospect of mining methods and equipment in underground coal mines in Yulin area

  • 摘要: 陕西榆林是我国的重要煤炭生产基地,对国家能源安全与煤炭保供起到重要作用。基于榆林地区井工煤矿开采现状,系统分析了该地区在采煤方法与开采装备方面的创新实践与发展趋势。在煤层赋存方面,延安组煤层倾角近水平、结构简单,煤层厚度为0.80~13.06 m,形成了中厚煤层、厚煤层和特厚煤层的多样化开采条件,煤层顶板呈“直接顶稳定、基本顶坚硬”的特征。在产量方面,原煤产量由1978年的0.01亿t增长至2025年的6.37亿t,全国占比由0.17%提升至13.1%,千万吨级矿井达17座,煤炭产量长期保持高位增长态势,已成为全国煤炭供应格局中的重要支撑区域。在采煤方法方面,经历了短壁开采、长壁综采初期、长壁综采普及、智能化探索和绿色开采5个阶段,总体呈现工作面由短变长、采高由小变大、装备由引进到国产、控制由人工到自动的演进脉络,建成了中厚煤层超长工作面综采、厚煤层大采高综采、特厚煤层超大采高综采与综放开采以及充填开采4类核心技术体系。在装备发展方面,液压支架工作阻力由6 000 kN提升至29 000 kN,支撑高度由3.5 m提升至10.0 m,采煤机总功率由850 kW提升至3 350 kW,刮板输送机运量由1 500 t/h提升至8 000 t/h,关键装备实现了从引进消化到国产主导的跨越,支撑了开采参数的持续突破。以小保当二号煤矿450 m超长工作面、曹家滩煤矿10 m超大采高综采、金鸡滩煤矿7 m超大采高综放开采和麻黄梁煤矿充填开采为典型案例,对应中厚煤层、特厚煤层以及建(构)筑物压煤3类不同条件,展示了榆林地区在不同煤层条件下的采煤工艺与装备水平。同时,针对当前面临的主要技术挑战进行了深入剖析:深部开采引发的强矿压与冲击地压灾害日益凸显,近距离煤层群开采中的层间扰动与采空区下支护难题尚未根本解决,早期房柱式采空区遗煤复采面临顶板失稳与多重灾害耦合风险,生态脆弱区保水采煤与充填开采仍受制于成本高、材料缺等技术经济瓶颈。展望未来,榆林地区采煤技术将向高效化、智能化、精准化、绿色化及低碳化五大方向纵深发展,为西部地区煤矿智能高效发展与绿色低碳转型提供示范。

     

    Abstract: Yulin, Shaanxi Province is an important coal production base in China and plays an important role in national energy security and ensuring coal supply. Based on the current mining situation of underground coal mines in Yulin area, this paper systematically analyzes the innovative practices and development trends in coal mining methods and mining equipment in this area. In terms of coal seam occurrence, the coal seam dip angle of Yan’an Formation is nearly horizontal and its structure is simple, and the thickness of coal seam ranges from 0.80 m to 13.06 m, thus forming diversified mining conditions for medium-thick, thick and extra-thick coal seams. The coal seam roof is characterized by “stable direct roof and hard basic roof”. In terms of output, raw coal output has increased from 1 million tons in 1978 to 637 million tons in 2025, the national proportion has increased from 0.17% to 13.1%, and there are 17 ten-million-ton mines. Coal output has maintained a high growth trend for a long time and has become an important supporting area in the national coal supply pattern. In terms of coal mining methods, it has gone through five stages: short-wall mining, early stage of long-wall mining, popularization of long-wall mining, intelligent exploration and green mining. The overall situation shows that the working face has changed from short to long, the mining height has changed from small to large, and the equipment has evolved from import to domestic production and control from manual to automatic. Four core technical systems have been built for fully mechanized mining at ultra-long working face in medium-thick coal seam, fully mechanized mining in thick coal seam with large mining height, fully mechanized mining and fully mechanized top-coal mining with ultra-large mining height in extra thick seam and filling mining. In terms of equipment development, the working resistance of hydraulic support is increased from 6 000 kN to 29 000 kN, the support height is increased from 3.5 m to 10.0 m, the total power of shearer is increased from 850 kW to 3 350 kW, and the transportation capacity of scraper conveyor is increased from 1 500 t/h to 8 000 t/h. Key equipment has realized the leap from introduction and digestion to domestic dominance, supporting the continuous breakthrough of mining parameters. Taking 450 m ultra-long working face in Xiaobaodang No.2 Coal Mine, 10 m extra-high mining height fully mechanized mining in Caojiatan Coal Mine, 7 m extra-high mining height fully mechanized caving in Jinjitan Coal Mine and filling mining in Mahuangliang Coal Mine as typical cases, corresponding to three different conditions of medium-thick coal seam, extra-thick coal seam and coal trapped under buildings (structures), demonstrating the coal mining technology and equipment level of Yulin area under different coal seam conditions. At the same time, the main technical challenges are deeply analyzed: the disasters of strong ground pressure and rock burst caused by deep mining are increasingly prominent; the problems of interlayer disturbance and support under goaf in the mining of close-distance coal seams have not been fundamentally solved; the re-mining of residual coal in early room-column goaf faces the risk of coupling roof instability and multiple disasters; and water-retaining mining and filling mining in ecologically fragile areas are still subject to technical and economic bottlenecks such as high cost and lack of materials. Looking forward to the future, the coal mining technology in Yulin area will develop in depth in five directions: efficiency, intelligence, precision, green and low-carbon, providing a demonstration for the intelligent and efficient development and green and low-carbon transformation of coal mines in the western region.

     

/

返回文章
返回