西部矿区覆岩-煤柱群失稳临界时间节点研究

Critical failure time of roof and standing pillars in China western mining area

  • 摘要: 为分析覆岩-煤柱群回收前的稳定性,采用数值模拟软件Flac3D分析了煤柱蠕变期间塑性区发育及内部应力分布形式的演化特征,发现:蠕变过程分为快速变形、缓慢变形及加速失稳3个阶段,并总结出了不同阶段塑性区发育和内部应力分布形式的对应关系;在分析覆岩和煤柱相互作用的基础上,建立了弹性地基薄板模型,推导出了顶板变形、煤柱受力与煤柱塑性区发育范围之间的计算方程组,揭示了覆岩-煤柱群减弱至失稳的动态变化特征;给出了覆岩-煤柱群体系失稳临界时间节点判据和方法,并结合工程算例进行了分析。

     

    Abstract: Stress and displacement field of roof and standing pillars ( RSP) are always in a state of flux,its stability should be studied before recovering the standing pillars. The creep process of coal pillars is analyzed by Flac3D . The process could be divided into three stages:rapid deformation,slow deformation and accelerating failure. Also,the laws of plastic zone and inner stress distribution pattern of coal pillars at different stages are obtained. Based on the theoreti- cal analysis,one thin plate on elastic found model is established to analyze the relationship between the roof deforma- tion,the force on the pillars and the ranges of plastic zones of coal pillars,and the proposed model allows to reveal the dynamic evolution of the decreasing-failure process of RSP. Furthermore,a criterion for evaluating the critical failure time of RSP is then given in this study,which is illustrated through an engineering case.

     

/

返回文章
返回