基于煤体卸压钻孔钻屑的冲击危险性检测方法及应用

Coal burst risk monitoring method based on the drilling powder of destressing drilling in coal seam and its application

  • 摘要: 钻屑法是煤矿常用的冲击地压危险性检测方法,而大直径卸压钻孔的施工方法与钻屑法类似,但由于缺少相应的大直径卸压钻孔的钻粉率指数以及高效便捷的称重方法,大直径卸压钻孔钻屑法未能得到广泛应用。文中基于标准孔径钻屑法的钻粉率指数,提出考虑卸压扰动的大直径卸压钻孔钻粉率指数及临界煤粉量确定方法;通过开展室内煤样钻孔卸压—煤粉测量试验,探究钻孔孔径、煤粉量、煤样初始应力及卸压后应力间的函数关系,进而给出孔距为1、2和3 m条件下孔径为150 mm的卸压钻孔钻粉率指数及临界煤粉量的建议值;并结合研发的煤粉自动测量装置,在井下冲击危险巷道开展大直径卸压钻孔钻屑检测应用。结果表明:煤样钻孔煤粉量与钻孔孔径、煤样应力呈正相关关系,钻孔卸压后煤样应力降低率与钻孔孔径—孔距比呈正相关性;孔径为150 mm的卸压钻孔的钻粉率指数大于孔径为44 mm的钻孔的钻粉率指数,且随着钻孔间距的减小而逐渐增大;山东唐口矿6310工作面孔径为150 mm的卸压钻孔的煤粉量为25~93 kg/m,在巷帮12~14和18~20 m深处存在高应力区,沿空巷道煤粉量明显大于实体煤巷道。通过大直径卸压钻孔钻粉率指数确定方法和煤粉自动测量装置相结合,形成了基于煤体卸压钻孔钻屑的冲击危险性检测方法,为巷道高应力危险区“卸压−检测”同步作业提供了一种实用技术途径。

     

    Abstract: The drilling powder monitoring method is one commonly used method for coal burst risk evaluation in coal mines. The construction method of large-diameter destressing drilling is similar to that of the drilling powder monitoring method. However, due to the lack of drilling powder rate index and efficient weighing method, the drilling powder method based on destressing drilling has not been widely used. Therefore, based on the drilling powder rate index of standard drilling powder monitoring method, one method for determining the drilling powder rate index and the critical powder of large-diameter destressing drilling is proposed, in which its pressure relief effect is considered. By carrying out the laboratory tests of drilling in coal specimens, the functional relationship among the drilling diameter, powder, initial stress and stress after pressure relief is obtained. Then the suggested value of the drilling powder rate index and critical powder of 150mm diameter drilling with 1, 2 and 3 m spacing are obtained. Finally, by using the auto measuring device, the drilling powder of destressing drillings are measured in coal burst risk roadway. The results show that the drilling powder is positively correlated with the drilling diameter and coal stress. Meanwhile, the stress reduction rate after drilling is positively correlated with the drilling diameter-spacing ratio. The drilling powder rate index of 150 mm diameter destressing drilling is higher than that of 44 mm diameter drilling, and the index increases with the decrease of drilling spacing. The drilling powder of 150 mm diameter drilling in 6310 workingface of Tangkou Mine in Shandong is 25~93 kg/m, and there is high stress area at the depth of 12~14 m and 18~20 m from the coal wall. The drilling powder in the gob-side roadway is significantly heavier than that in the solid-coal roadway. Combing the drilling powder rate index determining method and the powder auto measuring device for large-diameter drilling, the coal burst risk monitoring method based on the drilling powder of destressing drilling is developed, which can provide one operative technical approach for the synchronous operation of pressure relief-monitoring in coal burst risk roadway.

     

/

返回文章
返回