吴姗, 杨小聪, 郭利杰. 高应力环境下深部金属矿整体规划的思考与展望[J]. 煤炭学报, 2019, (5). DOI: 10.13225/j.cnki.jccs.2019.6023
引用本文: 吴姗, 杨小聪, 郭利杰. 高应力环境下深部金属矿整体规划的思考与展望[J]. 煤炭学报, 2019, (5). DOI: 10.13225/j.cnki.jccs.2019.6023
WU Shan, YANG Xiaocong, GUO Lijie. Thinking and prospect of overall planning for deep metal mine in high stress environment[J]. Journal of China Coal Society, 2019, (5). DOI: 10.13225/j.cnki.jccs.2019.6023
Citation: WU Shan, YANG Xiaocong, GUO Lijie. Thinking and prospect of overall planning for deep metal mine in high stress environment[J]. Journal of China Coal Society, 2019, (5). DOI: 10.13225/j.cnki.jccs.2019.6023

高应力环境下深部金属矿整体规划的思考与展望

Thinking and prospect of overall planning for deep metal mine in high stress environment

  • 摘要: 我国现有的矿山开采规划主要是基于浅部矿床开采实践所形成的,通常只考虑经济与工程因素。在采矿全生命周期开展开采规划,优先获取高品位的矿石,从而获得最大经济效益。深部开采处于“三高一扰动”引起的复杂地质力学环境,高地应力的影响是深部矿山开采规划重要因素。本文开展了对深部高应力环境下金属矿整体规划领域的文献调研和问题探讨。首先,以实现矿山资源开发投资价值为目标,从战略规划与战术规划两个维度分层次讨论了深井矿山从整体到局部设计的过程,适用于一般深部矿山开采的全生命周期规划,并重点分析了岩石强度时效性对于开展深井矿山整体规划具有重要的现实意义。其次,阐述了当前国内外深井矿山在高应力条件下的设计与布局,正“V”型及倒“V”型采矿顺序应用于深部均未能兼顾“改善应力状态”与“获取最大净现值”,理想的四周型开采顺序不失为一种兼顾的采矿布局,但在实际开采应用过程中,工程布置及采场应力状态还需进一步探讨。最后,指出了整体规划模型中的应力预测与校准对于预测高危险区域及指导深部开采规划的重要意义。在深部矿山开采规划中充分考虑高应力环境的工程影响,如何将高应力环境及其随开采过程的演变规律完全融入到开采规划中,还需开展进一步研究工作。

     

    Abstract: The existing mine planning in China is mainly based on the practice of shallow mining,and usually only considers economic and engineering factors. Mining planning is carried out throughout the whole life of the mine,giving priority to high-grade ore for maximum economic benefit. Deep mining is in a complex geomechanical environment caused by three “high” and one “disturbance”,and the influence of high ground stress is an important factor in deep mine planning. This paper has carried out literature review on the overall planning of metal ore in deep high stress en- vironment. Firstly,this paper aims at realizing the investment value of mine resource development,and discusses the process from the whole to the partial design of deep mine from two dimensions of strategic planning and tactical plan- ning,which is suitable for the overall planning of general deep mines. The practical significance of the timeliness of rock strength to the overall planning of deep mines is analyzed. Secondly,the design and layout of deep mines at home and abroad under high stress conditions are expounded. The “V” type and the inverted “V” type mining sequence are applied to the deep mining and failed to balance “improving the stress state” and obtaining the maximum net present value,correspondingly,thus,the ideal surrounding mining sequence is a balanced mining layout. However,the mine layout and the stress state of stope need to be further explored in the actual mining application process. Finally,the im- portance of stress prediction and calibration in the overall planning model for predicting high-risk areas and guiding deep mine planning is pointed out. In deep mine planning,further research works,for example,fully considering the engineering impact of high stress environment,and how to fully integrate the high stress environment and its evolution law with the mining process,are needed.

     

/

返回文章
返回